Ghana: Picking up the pieces After the floods
27.09.2007
A very dry spell preceding the floods affected the whole country, almost leading to the closure of the hydroelectric dam at Akosombo in the south-east; this facility is fed from the north by the Volta River. Then, in late August, came the rains, deluging the Northern region and the Upper East and Upper West regions, also in the north. The downpours forced families. who had been battling with the drought, to deal with a different type of natural disaster, with many fleeing their homes.